Glazing Project Estimation Form
I. Project Identification & General Information
Project Name:
Project Address:
Project Type:
Select Type
Commercial
Residential
Renovation
New Construction
Other
Building Type:
Select Type
Office Building
Retail
Healthcare
Education
Multi-family Residential
Industrial
Hospitality
Cultural/Civic
Other
Architect/Designer:
II. General Contractor Information
Requesting GC Company Name:
GC Contact Person:
GC Email:
GC Phone:
GC Bid Package Number (if applicable):
III. Bid Details
Date Bid Package Received:
Bid Due Date:
Bid Due Time:
Bid Delivery Method:
Select Method
Email
Online Portal
Hard Copy
Other
Pre-bid Meeting Required/Attended?
Yes
No
Site Visit Required/Completed?
Yes
No
Addenda Received? (List all numbers and dates, e.g., A1-MM/DD/YYYY, A2-MM/DD/YYYY)
Tax Exempt?
Yes
No
If Yes, Tax Exempt Certificate Provided?
Yes
No
IV. Scope of Work & System Specifications
A. Overall Project Requirements
Project Specifications & Blueprints Reviewed?
Yes
No
Drawings Reviewed (Shop Drawings, Plan Views, Elevations, Details)?
Yes
No
Are job-specific details correct?
Are system and finish information correct?
Are glass types correctly shown and labeled?
Are dimensions verified/correct with architectural drawings?
Are joint sizes correct/adequate for job conditions?
Projected Start Date:
Projected Completion Date:
Access to Building/Site:
Staging Area Availability?
Yes
No
Safety Requirements/Plans:
Special Equipment Needs:
Waste Management/Disposal:
B. Storefront Systems
System Type:
Manufacturer/Series:
Frame Material:
Select Material
Aluminum
Steel
Wood
Other
Finish Type:
Glass Type (Exterior Storefront):
Glass Type (Interior Storefront, if applicable):
Acoustic Requirements (STC/OITC):
Energy Efficiency Requirements (U-Value/SHGC):
Hardware:
Hardware Schedule Reviewed?
Access Control Integration?
Joint Sealant Type:
Joint Sizes Verified?
Sub-sills/Flashings Required?
Back Pans/Curtain Wall Insulation Required?
C. Curtain Wall Systems
System Type:
Manufacturer/Series:
Frame Material:
Select Material
Aluminum
Steel
Timber
Terracotta
Other
Finish Type:
Glass Type (Exterior Curtain Wall):
Glass Type (Interior Curtain Wall, if applicable):
Acoustic Requirements (STC/OITC):
Energy Efficiency Requirements (U-Value/SHGC):
Sealant Type:
Joint Sizes Verified?
Drainage Capabilities:
Fire Safing/Floor Line Items?
Building Movement/Expansion Joints (Consideration/Details):
Back Pans/Curtain Wall Insulation?
D. Storefront Doors (Part of Storefront System or Standalone)
Door Type:
Frame Material:
Select Material
Aluminum
Steel
Other
Stile/Rail Size:
Finish Type:
Glass Type (Door):
Hardware Schedule by Door Mark (Reviewed for each door)?
Yes
No
ADA Compliance?
Exit Device Requirements:
E. General Glazing
Application:
Glass Type (General Glazing):
Framing/Support System:
Hardware:
Sealants/Gaskets:
Regulatory Compliance:
V. Performance & Regulatory Requirements
Wind Load Requirements:
Seismic Requirements?
Yes
No
Building Code Compliance:
Energy Code Compliance:
Accessibility (ADA) Compliance?
Fire Rating Requirements (for specific areas)?
Sound Transmission Requirements (STC/OITC):
Water Penetration Testing (ASTM E1105, AAMA 501.2) Required?
Yes
No
If Yes, testing protocol included in bid?
Yes
No
Thermal Performance (U-Value, SHGC, VT):
LEED or Green Building Certification Goals?
Yes
No
VI. Warranty & Post-Installation
Workmanship Warranty:
Material Warranty:
Special Warranties:
Maintenance Requirements/Recommendations Provided by Glazier?
Cleaning Procedures for Glass/Frames Provided?
Close-out Documents Required:
VII. Pricing & Costing Considerations
Material Costs:
Labor Costs:
Equipment Rental:
Transportation Costs:
Engineering/Shop Drawing Costs:
Permit Fees (If Glazier responsible):
Testing Costs (Water penetration, air leakage, structural):
Supervision/Project Management Overhead:
Contingency (Percentage for unforeseen issues):
Profit Margin:
Payment Terms:
Excluded Items (Clearly Defined):
VIII. Final Review
All sections completed?
Yes
No
Any unanswered questions or missing information? (List below)
Bid proposal thorough and complete?
Yes
No
Risks Identified and Mitigated?
Collaboration/Coordination required with other trades?
Submit Form